When installing the radiator, maintenance shall be considered, and the opening area shall be such that the whole set of radiators can be removed and lifted out. The decorative parts shall be movable, and the radiator can be easily lifted out to expose the whole pipe and the radiator in case of problems. The valve opening of riser and branch pipe shall be provided with space for valve removal and replacement

Instructions for correct use of radiator:

1. When testing water, leave someone at home and open the water inlet and return valve

2. The running wind shall be closed

3. Do not shake the heater, and do not bear the weight of radiator and pipeline

4. Non professional personnel shall not change the heating

5. Valves shall not be opened and closed frequently during heating season. The valve can only be fully open or closed

6. In case of water leakage, the water inlet and return valves shall be closed immediately

7. Check whether there is water leakage at each interface within three days after shutdown

8. The steel heating is ideal for full water maintenance. Close the inlet and outlet valves of the heating system within one day after the central heating system is shut down